Start With Site Loads
Provide the site AC voltage and phase, load schedule, motor starting demand and critical circuits. Add the required backup duration and any PV, generator or battery equipment already installed.
Review the Complete Configuration
A matching system requires a review of battery voltage, usable energy, continuous current, inverter output, communication and protection. Enclosure size or nominal kWh alone does not establish electrical compatibility.
Prepare the Project Handover
Discuss the bill of materials, model-specific datasheets, installation documents, commissioning responsibilities and service process. Local installation and approval requirements should be confirmed for the project location.