On-site setup, commissioning and installer service references.

A group of PATTERN floor-standing batteries pictured with a laptop and electrical test tools during on-site setup.
View Installation →
Hybrid inverter and floor-standing battery commissioned on site with a laptop — parameters set, self-consumption and backup switchover verified before handover.
View Installation →
A certified installer walks the homeowner through the new system — checking inverter readings against the commissioning checklist before sign-off.
View Installation →
Our Nigeria service center runs a live test bench of PATTERN inverters and batteries — used for pre-delivery inspection, firmware setup and installer training.
View Installation →