Dual-Battery Utility Room Build — C&I · Vietnam

C&I · Vietnam

Engineers commissioning two floor-standing batteries with a wall-mounted hybrid inverter in a tiled utility room — replacing an aging board of manual changeover switches.

Project at a Glance

LocationC&I · Vietnam
ApplicationCommercial Energy Storage
Documented installationDual-Battery Utility Room Build

The Installation

Engineers commissioning two floor-standing batteries with a wall-mounted hybrid inverter in a tiled utility room — replacing an aging board of manual changeover switches.

The photograph provides a reference for the equipment arrangement and installation footprint. An equivalent system should be selected from the intended loads, available AC supply and required backup duration, rather than from the appearance or number of enclosures alone.

System Configuration Review

System ElementWhat to Confirm for a Similar Project
InverterExact model, AC voltage and phase, rated watts, starting demand and approved parallel arrangement.
Battery bankDC voltage, nominal kWh, continuous current, BMS communication and permitted bank configuration.
PV and protectionPV string limits, AC/DC protective devices, isolation, cable specification and local installation requirements.

Exact equipment serial numbers, full PV capacity and completion dates are not published for this photo record. Ask PATTERN for an approved model list for your own site; products linked below are selection references, not a claim that the same model was used here.

Installation Gallery

Dual-Battery Utility Room Build in C&I · Vietnam
Engineers commissioning two floor-standing batteries with a wall-mounted hybrid inverter in a tiled utility room — replacing an aging board of manual changeover switches.

Result & Next Steps

This record documents the installation shown above. No independently metered backup duration, energy savings or diesel reduction figures are published for this project. For your proposal, autonomy can be calculated from the selected battery’s usable energy and the measured critical load, then checked against inverter losses and operating reserves.

Send your installer a list of essential circuits and any loads that may be shed during an outage. Site access, ventilation, service clearance and the available distribution equipment should be reviewed before a final bill of materials is agreed.

Current Model Selection References

The following are catalogue references for comparison, not an identification of the equipment installed in this photograph.

Plan a Similar System

Get a Similar Quote →
WhatsApp Us Call Get Quote Factory direct · Reply within 4 working hours · English support